APBS conducted a comprehensive balcony renovation for three large balconies at the above address. The work required demolition of the existing tile and tile bedding as well as carefully removing sliding doors and louvered panels for later reinstallation. The project included a new waterproofing membrane, tile bed, tiling and parapet wall painting. The final phase ensured a clean and safe site, removing temporary hoarding, plastic protection, and debris.

Primary issues

APBS conducted a comprehensive balcony renovation for three large balconies at the above address. The work required demolition of the existing tile and tile bedding as well as carefully removing sliding doors and louvered panels for later reinstallation. The project included a new waterproofing membrane, tile bed, tiling and parapet wall painting. The final phase ensured a clean and safe site, removing temporary hoarding, plastic protection, and debris.

Root causes of these issues

Were likely rooted in the poor-quality workmanship of the existing balcony structures, leading to the need for extensive demolition and repair. The deterioration of waterproofing materials contributed to the challenges, necessitating a thorough installation of a new membrane. Furthermore, the complexity of tasks such as sliding door and screening panel removal and reinstatement could be attributed to the original construction methods and materials. Overall, the root causes appear to stem from the poor workmanship and quality of the original building components.

Solutions we implemented

APBS implemented a comprehensive strategy. This included strategic demolition to avoid as little disruption to the occupants as possible, careful removal and storage of materials for reinstallation, and the installation of a new waterproofing membrane to ensure a water-tight balcony ensuring a successful renovation.

Outcomes

The new waterproofing membrane successfully addressed water-related issues, ensuring enhanced durability and the new tiling resulted in an aesthetically improved and structurally sound environment. The careful demolition and storage facilitated seamless reinstallation of sliding doors and screening panels.

The duration of our service at this location

The renovation project was accomplished within a two-month timeframe. This schedule involved the precise execution of the specified scope of work components. We encountered a few days of inclement weather but were able to stay on program and finish the project on time. Our effective project management was instrumental in ensuring the renovation objectives were achieved successfully.

We want to say

It’s noteworthy that successful execution relied on careful planning, effective communication with stakeholders, and prioritising safety throughout the project. The renovation process involved close coordination with residents and the Principal Design Practitioner, ensuring a smooth and efficient construction experience. Emphasizing these aspects highlights the commitment to a well-managed project that met both project and safety objectives.